 |
| |
Sun |
Mon |
Tue |
Wed |
Thu |
Fri |
Sat |
| > |
|
|
|
01
|
02
|
03
|
04
|
| > |
05
|
06
|
07
|
08
|
09
|
10
|
11
|
| > |
12
|
13
|
14
|
15
|
16
|
17
|
18
|
| > |
19
|
20
|
21
|
22
|
23
|
24
|
25
|
| > |
26
|
27
|
28
|
29
|
30
|
|
|
Search events by...
Today's Events
|
|
|
Engine Work Part 2
Printable Version |
I have finished the bottom end and installed the oil pump, pan, and timing cover. The harmonic damper is so large that I had to bend the timing mark tab up and out of the way to get it on. |
I have the heads and roller rocker arms installed. Who knew that I would need longer pushrods? I rushed to PAW auto parts Sunday 10 minutes before they closed and got a new set. They worked OK. |
|
|
Left Side of Engine
|
Right Side of Engine
|
|
|
Completed Assembly
Here is the finished engine Assembly. The valve covers have gasketed removeable tops, and I have installed a set of wire looms. I bought a new distributor cap and a set of wires. I will get them installed soon. The main drive pulley and the water pump pulley only have one groove. I will need to get some others for the power steering pump. I have bought a separate vacuum pump to run the brakes. The cam has over .500 inch lift, and i don't know how much overlap. So, I don't know if it will make vacuum or not. I expect to find out when I run it on the test stand. That is my next project. To start next week. |
|
|
|